Hi again,
It has come to my attention that how these plans work out for the
translators isn't very clear. Sorry for this omission! I think it should
be done as follows:
29/05/14 07:49, anonym wrote:
> 2014-05-29 Test 1.1~beta1.
Starting *now* the *stable* branch in Tails' Git repo can be translated
for the 1.0.1 release. Can someone check the `po` directory in this
branch with `check_po.sh`?
For the non-Tails repos (Tails Greeter etc.) we have the problem that
their release branches have Wheezy-migration stuff merged into them, and
no branches with the last good state suitable for Squeeze has been
restored yet. OTOH nothing has been added since since 1.0 that should be
in 1.0.1 so I don't think this will be a problem unless some
translations are still unfinished. Any ideas?
> 2014-06-08 Firefox 24.6.0 ESR sources are available.
> Package and upload Firefox 24.6.0 ESR.
> Tag 1.0.1 in Git.
> Start building and uploading 1.0.1 ISO/IUKs...
The deadline for 1.0.1 translations is before this, so 2014-06-07.
> 2014-07-01 "Hard" feature freeze for 1.1.
Once the "hard" freeze for 1.1 happens, translation work for 1.1 should
be done in the *testing* branch in Tails' Git repo.
> 2014-07-20 Firefox 24.7.0 ESR sources are available.
The deadline for 1.1 translations is before this, so 2014-07-19.
Cheers!