Hi,
anonym:
> I'll be the RM, using this schedule:
In the end I'll be the RM and the schedule will be:
* 2019-03-17:
- Feature Freeze: Unless I have told you otherwise, all feature branches
targeting Tails 3.13 should be merged into the `stable` branch by
noon, CET. Ask if you need an exception!
- Start preparing Tails 3.13.
* 2019-03-18: Build and upload Tails 3.13
* 2019-03-19: Test and release Tails 3.13
Cheers,
--
intrigeri