[Freepto] Report meeting 20140919

Supprimer ce message

Répondre à ce message
Auteur: boyska
Date:  
À: Everything about freepto
Sujet: [Freepto] Report meeting 20140919

almost there!

TODO
=========

Tor-ntp
--------

Still documentation to do. documentation is very important for this task

Anyway, it's not a blocker for the beta.

USB
--------

needs testing, probably everything will be fine

ITALIAN:http://dev.freepto.mx/dev/paskao-evince-usb-utils/140912_13.52_v1.0alpha1-45-gdc842ac-it/140912_13.52_v1.0alpha1-45-gdc842ac-it.img

SPANISH:http://dev.freepto.mx/dev/paskao-evince-usb-utils/140912_16.45_v1.0alpha1-45-gdc842ac-es/140912_16.45_v1.0alpha1-45-gdc842ac-es.img

ENGLISH:http://dev.freepto.mx/dev/paskao-evince-usb-utils/140912_15.18_v1.0alpha1-45-gdc842ac-en/140912_15.18_v1.0alpha1-45-gdc842ac-en.img

--> boyska will test it (and merge it, if successful)

The RFT paskao sent on 10 Sep 2014 contains the issue to be closed

TrueCrypt
-------------

We are pretty satisfied with it.

There are some pending commits (l10n):
    - https://github.com/paskao/truecrypt-anche-no/commit/f23da0c0b8378c546d225bab1fac26bb3fddfc31
    - ...
they are easy to merge, and it's doable during the beta period (or even during RC!)


CA
----------

We'd like to do a Freepto CA and put it inside freepto. Vinc3nt worked on it, and will deploy it in a secure way.

The .pem will be inserted inside the .beta2 or later, but before .RC

Repository
------------

a simple problem: it's a complete mess.

Refactoring proposal:
    * packages are built from freepto-lb!
    * adapt the auto/build code to generate packages and integrate with reprepro
    * this requires a separate branch for each release to be created


Assigned to boyska ; this needs to be done during the beta period, because the RC1 needs it

Roadmap
-----------

(from here on, full test = https://we.riseup.net/freepto-wiki/freepto-test )

* beta1: as soon as usb is (successfully) tested; expected in 2014-09-21
  (that is, next sunday). 
* RC1; as soon as
    * CA is ready (vinc3nt)
    * repository is updated to berenjena (boyska) (expected for the
      end of september)
    * tor-ntp is closed (paskao) (expected in 23rd september)
    * non-developers have given some "full" tests of it (Average Joe)
* Stable: as soon as
    * full test on
        * apple hardware
        * old hardware
    * new documentation is ready
        * https://we.riseup.net/freepto-wiki/freepto-docs
        * https://we.riseup.net/freepto-wiki/freepto-docs-es


--
boyska