> Here's the preliminary release schedule:
>
> 2014-08-12 Feature freeze
> 2014-08-13 Tag 1.1.1-rc1 in Git.
> Build and upload 1.1.1-rc1 ISO/IUKs.
> 2014-08-14 Test 1.1.1-rc1
> 2014-08-15 Release 1.1.1-rc1
Aren't we supposed to skip RC for a point release? Or did I miss something?
--
sajolida