Re: [Tails-l10n] Release schedule for Tails 1.0.1 and 1.1

Supprimer ce message

Répondre à ce message
Auteur: Matsa
Date:  
À: tails-l10n
Sujet: Re: [Tails-l10n] Release schedule for Tails 1.0.1 and 1.1


Hi anonym, hi all,


> anonym <anonym@???> :
>
> Hi,
>
> As was decided during the last few days, Tails 1.1 will be postponed
> [1]. Ignore the old release schedule for Tails 1.1 [2]!
>
> Just to be clear, Tails 1.0.1 will be a point-release of 1.0 that's
> still based on Debian Squeeze, and all the different 1.1 releases will
> be based on Debian Wheezy.
>
> Here's the release schedule (unless I've misunderstood or made a
> mistake) for Tails 1.0.1 and 1.1:
>
> 2014-05-29 Test 1.1~beta1.
> 2014-05-30 Officially release 1.1~beta1.
>
>   2014-06-08   Firefox 24.6.0 ESR sources are available.
>                Package and upload Firefox 24.6.0 ESR.
>                Tag 1.0.1 in Git.
>                Start building and uploading 1.0.1 ISO/IUKs...
>   2014-06-09   Finish building  by 12:00 (CEST)
>                Start testing Tails 1.0.1 at 12:00 (CEST)...
>   2014-06-10   ... and finish it by 12:00 (CEST) on the 10th.
>                Officially release Tails 1.0.1.

>
>   2014-06-10   The remaining features aimed for 1.1 should be "almost
>                done" at this point. This should leave some room for
>                additional round-trips that may be needed to get them
>                into a mergeable state.

>
>   2014-06-15   "Soft" feature freeze for 1.1; developers should act as
>                if this is the actual feature freeze for 1.1.

>
>   2014-06-16   *Maybe* publish a 1.1~beta2 ISO without any testing
>                beyond a run in the automated test suite.

>
>   2014-07-01   "Hard" feature freeze for 1.1.
>                Tag 1.1~rc1 in Git.
>                Build and upload 1.1~rc1 ISO.
>   2014-07-02   Testing Tails 1.1~rc1.
>   2014-07-03   Officially release Tails 1.1~rc1.

>
>   2014-07-20   Firefox 24.7.0 ESR sources are available.
>                Package and upload Firefox 24.7.0 ESR.
>                Tag 1.1 in Git.
>                Build and upload 1.1 ISO.
>   2014-07-21   Testing Tails 1.1.
>   2014-07-22   Officially release Tails 1.1.

>
> Please let me know ASAP, intrigeri, if something in the above seems
> incorrect! If you ACK it, I'll update the calendar.



Thanks for keeping us up-to-date, as most of us do not read tails-dev.

Even with such a release schedule, it's still unclear to me when are
the deadlines to see our translations included in the final ISO:

for example, if we focus on Tails 1.0.1 release process, is there room
to improve our translations during the testing session of the 1.0.1 ISO,
the 2014-06-09?

It would make things really easier if we could check if our
translations are correctly applied with a freshly built ISO, especially
for Tails custom programs, like IUK and the greeter.

As I'm not familiar with the release process, could anyone clarify when
the translations are pulled from the different repositories?

A last thing, for the release of Tails 0.23, you sent us an email
including damn' usefull informations[1].
How can we get such a "diffstat"?

Thanks a lot, and cheers

[1] https://mailman.boum.org/pipermail/tails-l10n/2014-April/001132.html